References

Stålskorsten, Asgaard II project - SSM

Stålskorsten, projekt Asgaard ll

Industriskorsten på 150 meter til fiskefoderanlæg i Norge.

Mere
Danone steel chimney - SSM

Stålskorsten, GEA Niro

Stålskorsten på 40 meter til Danones fabrik i Irland.

Mere
Industriskorsten til Novozymes - SSM

Stålskorsten, Novozymes

Industriskorsten på 50 meter til biobrændstofanlæg i Danmark.

Mere

New slimline steel stack at Novozymes Bagsværd

70 M steel stack with a diameter of 2,5M with 2 innerliners of AISI316L for process gas. Mere

50 M new steel stack at Værløse heating plant

Demolition of old 50M brik chimney with steel innerliner - casting of new concrete foundation. Mere

35 M steel stack at Biomar Karmøy Norway

New 35 M steel stack with a diameter of 2600 mm surface treatment C5 High. Mere

35M exhaust stacks at Arendal powerplant

Demolition of 2 old corten steel stacks and erection of 2 new stainless steel stacks with a diameter of 3,9M Mere
62M high Corten steel shell with AISI316 innerliner. Mere

55 M steel stack with GRF innerliner at Grenå heating plant

Mere

Sewage water pipes at Lynetten in Copenhagen

12 M new sewage water pipes at a diameter of 1400/1800 mm for BIOFOS A/S New Waste Water plant at Lynetten in Copenhagen

Mere

35M steel stacks at Lahall Kraftverk

Lahall Kraftverk is a Swedish peak and reserve load powerplant with 4 independed production units Mere
Steelchimney, Asgaard II project - SSM

Steel chimney, Asgaard II project

117 meter industrial chimney for fish feed plant in Norway

Mere

BIOGAS

Stålskorstene til upgraderingsanlæg for BIOGAS. SSM(JSS) har gennem Malmberg i Malmø leveret 3 stk 15 skorstene til DONG`s upgraderingsanlæggene for bionaturgas i Bogense, Ringe og Gistrup. Mere

Longyearbyen Energiverk Norway

The Chimney at Longyarbyen Energiverk consists of a 90 M reinforced concrete windshield with 2 independent steel flue liners within its annular space. Mere

AB Fortum Värme – Orminge Sweden

Dismounting and demolition of existing 65 M Corten steel stack, inspection of existing foundation and design, manufacturing and erection of new steel stack with 3 innerliners for exhaust gas from 2 for oil boilers and 1 for pellets boiler..

Mere
CTR Peak load Plant at Gladsaxe Denmark

CTR Peak load Plant at Gladsaxe Denmark

Design, manufacturing and erection of 2 new 36 M steel stacks for exhaust fluegas at CTR.
Steel shell in S235 painted C4 with innerliners of stainless steel acid proof SISI 316L.

Mere
Cofely, La SoCieté de distribution de chaleur, Orleans, France

Cofely, La SoCieté de distribution de chaleur, Orleans, France

38 m steel chimney.

Mere

Novo Nordic A/S New Exhaust stacks

Mere

Lisbjerg

Steel structures and 4 New GRP innerliners for new concrete stack. Mere

Norfors Hørsholm

Replacement and removal of 2 pc of 100 M insulated corten innerliners in existing stack Mere

DTU Danish Technical University

Manufacturing and mounting of 10 pc of Ø2,5 M steel shell`s for shielding of HVAC ventilation pipes. Mere

Odderøya in Kristiansand

Ventilation stack for new purification plant at Odderøya in Kristiansand. Mere

Novozymes in Hillerød – New steel stack

Mere

26 M steel stack for Elverum

Mere

Bodø

35M High Steelstack with 3 innerliners of Cortenand Air craft warning lights - LED version. The stack is a part of a new bio-boilerplant at BE Varme AS in Bodø in Norway Mere
Vestforbrændingen in Copenhagen

Vestforbrændingen in Copenhagen

Renovation project – gangways and ventilation shells Mere